Residual Voltage in Power Cables: A Little-Known Hazard in Field Testing

Nilson Baroni Jr and Daniel Bento, Baur USA Corp; Danilo de Souza, UFMT; and Marcelo Plantier, Baur BrazilFall 2026 Industry Topics, Industry Topics

Verifying the integrity of power cable insulation is an essential step to ensure the reliability and safety of electrical systems. Applied-voltage tests are widely used before commissioning new cables and during maintenance and diagnostic activities throughout their service life. These tests enable identification of insulation defects, dielectric degradation, or installation issues that could lead to operational failures, supply interruptions, or …

Techniques for Conducting Fall-of-Potential Testing in Adverse Conditions

Andreas Burkart, AEMC, and Matthew J. Robinson, Sigma C Power ServicesFall 2026 Industry Topics, Industry Topics

Fall-of-potential (FOP) testing is widely regarded as one of the most reliable methods for evaluating grounding system performance. Under ideal conditions, the procedure is straightforward: Electrodes are driven into the soil at prescribed intervals, measurements are recorded, and resistance values are calculated with a high degree of confidence.  In practice, however, technicians often encounter less-than-ideal environments. Urban and industrial sites …

Transformer Ground Differential Element Behavior with CT Error and Misoperation Event Analysis

Seth Barnes and Tim Condra, Tennessee Valley Authority; Joshua Hughes, Qualus; and Akram Saad, University of Tennessee at Chattanooga & Quanta TechnologyFall 2026 Industry Topics, Industry Topics

This paper analyzes the ground differential or restricted earth fault (REF) element for transformer protection and compares its performance against various levels of current transformer (CT) error and saturation. An empirical analysis was performed to determine the limits of today’s common digital relays as they experience CT errors. This can help engineers develop general guidelines for designing protection systems related …

A Partial Discharge Case Study from an Insurance Perspective

Vincenzo Pagliuca, The Hartford Steam Boiler Inspection and Insurance CompanyFall 2026 Industry Topics, Industry Topics

I have spent many months researching how, as an equipment insurer, to enhance our understanding of underwriting risk by improving the assessment of electrical risk at medium- and high-voltage facilities through predictive analytics. The answer I found was partial discharge (PD) testing that uses touchless acoustical methods with intrinsic AI capability. Partial discharge is a localized voltage discharge within an …

Artificial Intelligence in Practice: Lessons and Applications for NETA Accredited Companies (Part 1)

Valer Banushi and Adis Talović, RESA PowerFall 2026 Industry Topics, Industry Topics

Artificial Intelligence (AI) is rapidly influencing industries worldwide, and the electrical testing field is no exception. This two-part article presents a comprehensive perspective on the role of AI within the electrical testing industry. It offers insights into future applications for NETA Accredited Companies, while considering opportunities and challenges AI may bring to the electrical testing industry.

NETA QEMC Partners

NETAFall 2026 Industry Topics, Industry Topics

WHY HIRE A NETA-VERIFIED QEMC AND QEMW TEAM?  Facility owners, utilities, contractors, and industrial operators need qualified organizations and personnel to perform maintenance in support of NFPA 70B. One of the most effective ways to achieve this objective is to partner with an electrical contractor that is a NETA Qualified Electrical Equipment Maintenance Company (QEMC) staffed by Qualified Electrical Equipment …

Volunteer Engagement Committee: Fostering Participation

Nenad Pasic, Kristen Schmidt, Nishat Maredia, Adis TalovićFall 2026 Volunteer Spotlight, Volunteer Spotlight

NETA offers many volunteering opportunities for interested parties to get involved with the association and share their feedback and expertise. This new Volunteer Spotlight series will feature volunteers across all NETA committees, showcasing their contributions, motivations, and interests. Our first Volunteer Spotlight appropriately features the Volunteer Engagement Committee. The committee works collaboratively with NETA leadership and all other NETA committees …

Looking for a NETA Accredited Company?

NETAFall 2026 Volunteer Spotlight, Volunteer Spotlight

WHY HIRE A NETA ACCREDITED COMPANY? Ensuring safety and reliability by maintaining a safe, reliable electrical power system requires more than routine maintenance. It requires objective testing, expert analysis, and proven industry practices. Hiring a NETA Accredited Company as an independent third-party testing agency provides organizations with the confidence that their electrical infrastructure is being evaluated to the highest recognized …

Grounding Test Requirements and Equipment: Know Before You Go

Lee Howard and Jacob Rioux, Hood Patterson & DewarColumns, Fall 2026 Columns, Tech Tips

The gold standard for grounding testing is IEEE Std. 81–2025, Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System. Its purpose is to assist engineers and technicians in obtaining accurate, reliable grounding system measurements and interpreting data for design validation. This standard covers: In addition to being familiar with this standard, successful testers must …

Quiz #153: Electrical Equipment Advanced Technology

Morgan Gieni, Magna IV EngineeringColumns, Fall 2026 Columns, Tech Quiz

The basics of electrical equipment remain constant; however, modern technologies continue to transform how equipment is monitored, controlled, and maintained. To remain industry leaders, NETA Certified Technicians must continuously learn and develop expertise in these advanced solutions.  1. Which online monitoring device is used to detect the development of insulation voids?a. Power monitorb. Partial discharge monitorc. Arc flash sensord. Corona …