Featured Stories


Partial Discharge Secrets, Tips, and Tricks

Most of us started our electrical careers with fairly good knowledge about the practical aspects of our jobs. We understood voltage, current, power, resistance, etc. We mastered the more esoteric ...

Acceptance and Maintenance Testing Medium-Voltage Electrical Power Cables

As time progresses and a cable system ages, the system’s bulk dielectric strength degrades. During this aging process, artifacts such as water trees, delamination, voids, and shield corrosion raise the ...

Using VLF And PD Testing to Improve Commissioning Reliability

Methods to check medium voltage cable integrity have evolved drastically in the last 30 to 40 years. The DC hipot test has largely been replaced by the 0.1 Hz very-low-frequency ...

Columnists


Image
 James R. White

Shermco Industries

Tech Quiz
NFPA 70E and NETA

Protective Relaying

Looking at NFPA 70E 2021 — Part 1

Image

Jeffrey Jowett

Megger Tech Tips

Ground Testing Procedures

Image

Scott Blizard
President's Desk

American Electrical Testing Company LLC

NETA President

Welcome to the Winter Edition

Image
Ron Widup
Shermco Industries NFPA 70E and NETA

Looking at NFPA 70E 2021 — Part 1

Image

Steven Turner

Arizona Public Service Company

Relay Column

Combustion Turbine Generator Trip Analysis

Image
Paul Chamberlain
Asplundh Engineering Services, LLC Safety Corner

Basic Fall Protection

    NETA technicians are encouraged to share their stories via our “In the Field column, which explores real-world examples and challenges faced by the electrical testing industry today. Submit your stories by clicking below or learn more about how to submit additional articles.
    LEARN MORE ABOUT SUBMITTING

    Industry Topics


    Power Quality, Reliability, and Sophisticated Automated Systems

    What do robotics, artificial intelligence (AI), automation, synaptic performance indicators (SPI), and machine learning (ML) have in common? In addition to being buzzwords for the reliability professional to throw around, the reliability world uses these terms to get practitioners to ...

    CAP corner


    IEEE Transformers Committee Report

    The IEEE Transformers Committee has been very active this past year, with back-to-back record attendance for the fall and spring ...

    Specs & Standards


    ANSI/NETA Standards Update

    ANSI/NETA ATS–2017 Revision Underway ANSI/NETA ATS–2017, Standard for Acceptance Testing Specifications for Electrical Power Equipment & Systems continues an American National Standard revision process that is scheduled to be completed by the end of 2020. The new edition will be ...

    find NETA Accredited Companies


    SEARCH HERE