The Cost of a Poor Connection: Lessons from a VLF Testing Failure

Brandon Sedgwick, Hood Patterson & DewarColumns, Tech Tips, Winter 2026 Columns

Very-low-frequency (VLF) testing is a valuable tool for verifying the condition of medium-voltage cables. However, the quality of the results depends heavily on proper setup, careful monitoring, and a clear understanding of what the test is evaluating. When test configurations introduce unintended equipment into the circuit or when terminations are not fully seated, the test can shift from a diagnostic exercise to a destructive test. The following example highlights how a seemingly minor setup issue can escalate quickly, creating costly repairs and reinforcing the importance of proper test procedures. 

Figure 1: This transformer bushing was damaged during the VLF test.

During VLF testing of a 35 kV cable, while the cable was connected to the bushings of an associated oil-filled transformer, the testing firm severely damaged both a transformer bushing (Figure 1) and the cable termination (Figure 2). Because the transformer had not been energized outside this test, the evidence suggests the damage resulted from a loosely seated cable termination that created an air gap between the surface of the bushing resin and the termination body.

Figure 2: The cable termination was also damaged during the VLF test.

That condition likely caused internal arcing at the connection point between the bushing and cable termination. The testing appears to have continued for an extended period because the test data was not being actively attended to by the technician. An attentive technician would  have observed the poor results and aborted the test before the damage became significant. After the incident, the bushing and cable termination components required replacement and re-testing, which caused avoidable and unnecessary costs for the client, project delays, and a serious quality-control concern for the testing firm.

LESSONS LEARNED AND BEST PRACTICES

This incident underscores that successful VLF testing depends on more than the test itself; it requires disciplined preparation, careful equipment isolation, active monitoring, and the ability to identify when test results indicate a problem that requires the test to be stopped. The following best practices can help reduce the risk of preventable damage and improve the reliability of test outcomes.

  1. Avoid connecting cables to a transformer during VLF testing, as transformer insulation leakage current can mask cable deficiencies and compromise test interpretation.
  2. Do not subject transformer internals to VLF test voltages. If cables are too short to test individually, connect the three-phase conductors together instead of testing through the transformer.
  3. Continuously monitor the test set and data throughout the test, so failing readings can be identified, and the test can be stopped before significant damage occurs.
  4. Configure the VLF test set to trip off immediately when arcing is detected rather than allowing the equipment to continue operating through a fault condition.
  5. Confirm all cable-to-cable connections are fully seated, tightly connected, and properly lubricated with grease to prevent air intrusion at the termination interface.
  6. Document and acknowledge testing errors promptly so corrective action can begin quickly, and the client relationship is protected.

VLF testing is a powerful diagnostic tool, but its value depends on proper execution from setup through interpretation of final results. This incident is a reminder that small oversights in termination, isolation, or monitoring can quickly become expensive equipment failures. By verifying every connection, appropriately isolating equipment, configuring test settings properly, and responding immediately to abnormal test data, testing teams can prevent avoidable damage, protect client assets, and deliver accurate, reliable results. 

Brandon Sedgwick, PE, is President of Hood Patterson & Dewar, where he oversees offices in five states and leads a large team that includes registered Professional Engineers (PEs), degreed engineers, and skilled test technicians. He manages projects for critical facilities and infrastructure, functions as an owner’s representative, provides factory witness testing, and leads forensic investigations. With extensive experience in both newly constructed and live-site facilities, Sedgwick specializes in functional performance verification and troubleshooting of complex electrical distribution systems, as well as commissioning of integrated building systems.