The Cost of a Poor Connection: Lessons from a VLF Testing Failure

Brandon Sedgwick, Hood Patterson & DewarIn Every Issue, Tech Tips, Winter 2026 In Every Issue

Very-low-frequency (VLF) testing is a valuable tool for verifying the condition of medium-voltage cables. However, the quality of the results depends heavily on proper setup, careful monitoring, and a clear understanding of what the test is evaluating. When test configurations introduce unintended equipment into the circuit or when terminations are not fully seated, the test can shift from a diagnostic …

Quiz 154: High-Voltage Utility vs. High-Voltage Industrial

Morgan Gieni, Magna IV EngineeringIn Every Issue, Tech Quiz, Winter 2026 In Every Issue

Utility generation is held to high standards to ensure consumers receive clean, reliable power. However, industrial facility owners must take care to limit their impact on the grid. As NETA Certified Technicians, we must be aware of the required quality standards as they pertain to both utility and industrial applications.  1. In IEEE Std. 519, Harmonic Control in Electric Power …

Drug and Alcohol Policies: Do You Manage Them?

Paul Chamberlain, Asplundh Engineering Services, LLCIn Every Issue, Safety Corner, Winter 2026 In Every Issue

In roles with many different companies, I have overseen drug and alcohol programs and employee testing (called a Designated Employer Representative, or DER). The regulation of illicit substances or even prescribed drugs can be complex for most organizations, depending on what they do and where they work. In my home state, recreational marijuana use is legal. However, this is regulated …

Power Equations for Generator Uprates

Steven Turner, ConsultantIn Every Issue, Relay Column, Winter 2026 In Every Issue

Power equations are very useful. For example, they help ensure that specific North American Electric Reliability Corporation (NERC) Protection and Control (PRC) standards remain satisfied when a generator’s power output is uprated.  Assume for this particular example that the following generator real power output is to be uprated from 1,220.58 MW (P1) to 1,241 MW (P2). The pertinent nameplate original …

Building Reliability into the Life Cycle of a Substation

Mose Ramieh, CBS Field ServicesIn Every Issue, In the Field, Winter 2026 In Every Issue

Utility and industrial substations are made reliable through testing and validation at each stage of their life cycle. Each stage has its own opportunity to avoid nuisance issues or catastrophic failures. Acceptance testing determines whether the substation starts out as designed. Routine inspections monitor whether it stays that way. Maintenance testing determines how well we understand its condition as it …

When the One-Line Lies: Your Duty as Technician to Prove What is Actually Dead

Ron Widup, Vector PowerIn Every Issue, NFPA 70E and NETA, Winter 2026 In Every Issue

A recent article in BBC Science Focus had the following statement from Dr. Kirsty King: “Lie detectors don’t work. Body language is unreliable. But there are ways to tell if someone is lying. You just have to listen carefully to what they’re saying. Spotting a liar is a vital skill. We all want to be better at it because lies …

Answering the Call For Reliability

Dan Hook, CBS Field Services, NETA PresidentIn Every Issue, President's Desk, Winter 2026 In Every Issue

As 2026 draws to a close, I’m struck by how much our industry has asked of us this year, and by how well the NETA community has answered. Demand for reliable, safety-tested electrical power has never been higher, and the professionals who commission and maintain that infrastructure have never been more essential. That pressure shows up everywhere. AI-driven data center …